
Pleasant Valley Subdivision Road and Drainage Improvements
PTS provided Construction Management Services for the Pleasant Valley Subdivision Road and Drainage Improvements – Phase 1B.

City of Valdez - Standard Construction Specifications Update
PTS is assisting the City of Valdez with updating its Standard Construction Specifications.

Port of Alaska
PTS provided Project Administration and Construction Management services on several projects at the Port of Alaska.

Becharof Street Water Rehabilitation
PTS provided topographic survey, project scoping assistance, civil engineering, and construction inspection services for the Anchorage Water and Wastewater Utility (AWWU) Becharof Street, Rakof to Chirikof Water Rehabilitation project.

ADA Improvements
PTS provided construction management services to assist the Municipality of Anchorage, Project Management & Engineering Department in constructing Americans with Disabilities Act (ADA) compliant pedestrian routes in various locations throughout Anchorage.

East Northern Lights Boulevard Water Rehabilitation
PTS provided design services for the Anchorage Water and Wastewater Utility (AWWU) E. Northern Lights Blvd Water Rehabilitation, Augustine Drive to Muldoon Road project.

City of Valdez - Pavement Management Plan Phase 1
PTS is providing Survey and Construction Management services for 4 road improvement projects in the City of Valdez under Pavement Management Plan Phase 1.

Seward Highway Construction
PTS is continuing to work with AKDOT performing construction inspections and ensuring SWPPP compliance.
AWWU King Street Campus Expansion
PTS was awarded a contract to provide platting services and design of improvements for the new property, including street and cul-de-sac improvements, water main extension, cold storage building, site grading and drainage, access and security, lighting and landscaping.

U-Med Pedestrian Improvements
PTS provided inspection services to improve pedestrian facilities, including landscape buffers, walkways, and a new bus stop in the U-Med area of Anchorage.

Yosemite Drive Upgrade
PTS provided project management and inspection services for improvements to Yosemite Drive in Eagle River.

Duben Avenue Upgrade
PTS provided project management and inspection services for upgrades to Duben Avenue between Patterson Street and Muldoon Road. Improvements included new pavement, curb and gutter, storm drain, pedestrian facilities, lighting, retaining walls on either side of the street, and associated landscaping.

Yosemite Drive Area Drainage Improvements
PTS managed all aspects of this project, including design and construction of storm drain improvements for Yosemite Drive in Eagle River.

East Klatt Road Drainage Improvements
PTS provided project management and inspection services for drainage improvements in south Anchorage.

Raspberry Road Rehabilitation
PTS provided survey, design study reporting, civil design, and construction inspection services for the rehabilitation of this west Anchorage arterial street.

Lawhorn Estates Development
PTS provided platting, civil design, and construction management services for an 8-lot residential development in East Anchorage.

32nd Avenue Upgrade
PTS performed survey, design study reporting, and civil design services for this street and storm drain improvement project in east Anchorage. Tasks included hydraulic analysis, retaining wall design and utility conflict assessment.

Wesleyan Drive Water Improvements
PTS provided design services to replace ~2,400 lf of water main and associated services in the U-Med District of Anchorage. Work included a design study, HDD coordination at two locations beneath Chester Creek, logistics for incorporation of street/storm drain improvements, and preparation of two bid separate packages.

Pressure Zone 430 Conversion
PTS performed a field survey, prepared a Technical Memorandum, and completed civil design and construction inspection for re-configuring the existing water distribution system to provide redundancy and improved performance in South Anchorage.