Pressure Zone 430 Conversion
PTS performed a field survey, prepared a Technical Memorandum, and completed civil design and construction inspection for re-configuring the existing water distribution system to provide redundancy and improved performance in South Anchorage. Tasks included review of water main maintenance history, coordination of water pressure changes for over 500 properties, water main intertie designs, and abandonment of an existing booster station.